Engineering Arbitration, Claims Evaluation & Delay Analysis Protocols

|Minhaj Engineering|7 min read
+
+
+
+
Engineering Arbitration, Claims Evaluation & Delay Analysis Protocols
MH-ART-10[DWG: MH-ART-DET]
+
+
+
+
Technical evaluation of construction claims, FIDIC contract disputes, and Critical Path Method (CPM) delay analysis.

[§10.01] Construction Dispute Resolution & Engineering Arbitration

Complex giga-projects require expert engineering arbitration when contractual disputes arise over variation orders or schedule extensions. Technical arbitration provides impartial dispute resolution.

[§10.02] Critical Path Method (CPM) & Delay Analysis (TIA)

Our arbitration team deploys Society of Construction Law (SCL) delay analysis methods—such as Time Impact Analysis (TIA) and As-Planned vs. As-Built comparisons—to determine root-cause delay liability.

[§10.03] FIDIC Claims Drafting & Quantum Evaluation

Minhaj drafts and defends technical and financial claims under FIDIC Red and Yellow Book frameworks, building evidentiary audit reports for arbitration tribunals.

[CAD_COMPLIANCE_SCANNER]

Minhaj immediate checking utility maps AutoCAD/BIM vector parameters directly to SBC schemas to cross-reference design tolerances automatically.

[DWG_LEDGER_DATA]

PUBLISHER:Minhaj Consulting
STD_CODE:FIDIC / SCL Delay Protocol
SHEET CODE:B-104_ARTICLE
Last Updated
[PROJECT_AUDIT_REQUEST]

Need to review your drawings and audit their compliance against regulatory Saudi Building Codes? Connect today.

PROJECT: TECHNICAL_BLOG_POST: ENGINEERING-ARBITRATION-CLAIMS|SHEET: B-104_DET // BLOG|SCALE: 1:1
AUDIT: SAUDI BUILDING CODE|REV: 1.1 // CERTIFIED